Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 492
Message text: Problemas en la conversión de cantidades de & a & para el ID de línea &
A unit of measure is assigned to the line ID. Cost elements with units
of measure are assigned to this line ID that cannot be converted to the
unit of measure of the line ID.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
The following actions would be possible:
Check the conversion of the unit of measure
Check whether the line ID should have a quantity update, and check the
unit of measure that was assigned to the line ID in the update.
Check the assignment - it may be that a cost element is assigned to the
wrong line ID.
Check whether the origin of the material is also updated.
Note that if a line ID was updated to an object with a particular unit
of measure, the unit of measure of the line ID on this object cannot be
changed.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KJ492
- Problemas en la conversión de cantidades de & a & para el ID de línea & ?Get instant SAP help. Start your 7-day free trial now.
KJ491
La base de beneficio & ya no se soporta
¿Qué causa este problema? In the <LS>Profit basis</> field in the valuation method, enter <ZH>C</> instead of D, or <ZH&...
KJ490
El procesamiento del plan de estructura del proyecto & ya no se soporta
¿Qué causa este problema? If you are not using fixed price agreements, enter <ZH>T</> instead of P in the <LS>Project structure&l...
KJ493
Clase reparto "O": Fije clase periodificación "E" e ind.beneficio "M"
¿Qué causa este problema? If the WIP or the reserves for unrealized costs are apportioned with method of apportionment O (revenue-based cost of goo...
KJ494
Costes plan < costes reales --> no puede usarse clase de reparto (&,&)
¿Qué causa este problema? The system is attempting to apportion a reserve to line IDs. It uses the difference between planned costs and actual cost...
Haga clic en este enlace para buscar todos los mensajes de SAP.