Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 392
Message text: Utilizar ind.beneficios 'R' sólo en caso de base de valoración O,Q o S
Profit indicator <ZH>R</> (results analysis according to the
<DS:GLOS.POC_method>POC method</> with profit realization according to
revenue planning) can only be used with the valuation bases <ZH>O</>
(planned costs, planned revenues), <ZH>Q</> (maximum of planned costs
and actual costs, planned revenues), and <ZH>S</> (maximum of planned
costs and cumulative actual costs, planned revenues).
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Go into Customizing and change the valuation basis in the valuation
method accordingly.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KJ392
- Utilizar ind.beneficios 'R' sólo en caso de base de valoración O,Q o S ?Get instant SAP help. Start your 7-day free trial now.
KJ391
Utilizar ind.beneficios 'R' sólo en caso de clase de periodif. 'E'
¿Qué causa este problema? Profit indicator <ZH>R</> (results analysis using the <DS:GLOS.POC_method>POC method</> with prof...
KJ390
Versión real en método de valoración fijada en '000'
¿Qué causa este problema? In the valuation method, you entered a version for simulation that is not 000. The system replaced this version with vers...
KJ393
Utilizar ind.beneficios 'R' sólo en caso de base de beneficios '&'
¿Qué causa este problema? You selected profit basis &V1& in the valuation method. This profit basis cannot be used with profit indicator &l...
KJ394
Reserva result. 'F': actualizar 'ID líneas CeCo' en métodos de val.
¿Qué causa este problema? In the valuation method, you selected results reserve <ZH>F</> (results reserve through revenue percentage, i...
Haga clic en este enlace para buscar todos los mensajes de SAP.