Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 338
Message text: La base de beneficios & no se puede utilizar en pedido de cliente SD.
If profit basis &v1& is used, the planned costs used for calculating
the profit are calculated in the standard cost estimate for the
material. This process is only allowed for a sales order item.
For logistical orders (such as production orders) and projects, the
planned costs are calculated in <DS:GLOS.cost_element_planning>cost
element planning</> or in a <DS:GLOS.unit_costing>unit cost
estimate</>.
Go into Customizing in the valuation method and choose a profit basis
that calculates the profit by using the costs and revenues planned by
cost element.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ337 Determinación resultados pedido cliente SD c.base beneficio & imposible
¿Qué causa este problema? For a sales order item, the planned costs that are used as a basis for calculating the profit can be calculated in the fo...
KJ336 En definición de asignación no se permite '*' como signo de enmascarado.
¿Qué causa este problema? You used an asterisk (*) instead of a plus sign (+) as the masking character.Respuesta del sistema El sistema emite un m...
KJ339 La periodif.proporcional a la ctd.sólo es posible p.pedido cliente SD
¿Qué causa este problema? The <DS:GLOS.results_analysis_version>results analysis version</> specifies a <DS:GLOS.results_analysis_ty...
KJ340 Datos periodif.manual sólo en caso período bloqueo & < inicio periodif.&
¿Qué causa este problema? The <DS:GLOS.cutoff_period>cutoff period</> divides the life cycle of the object into open and closed periods...
Haga clic en este enlace para buscar todos los mensajes de SAP.