Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 202
Message text: Actual. todas las cl. de coste de period. (gp. &) con la trans. OKG2.
Before you can perform <DS:GLOS.WIP_calculation>WIP calculation</> or
<DS:GLOS.results_analysis>results analysis</>, you must specify the
cost elements under which the <DS:GLOS.results_analysis_data>results
analysis data</> is to be written.
The cost element for the results analysis data of group &v1& is
missing.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Go into Customizing and enter the missing results analysis cost
elements in the corresponding table views:
For <DS:DE.ABGR_ABKAT>results analysis category</> 51, 52, 53, enter
cost elements for capitalized costs.
For 54, 55, 56, enter cost elements for reserves for unrealized costs.
For 57, 58, 59, enter cost elements for reserves for cost of complaints
and commissions.
For 60, 61, enter cost elements for reserves for imminent loss.
For 62, enter a cost element for capitalized profit.
For 63, 64, 65, enter cost elements for the cost of sales.
For 66, enter a cost element for calculated costs.
For 67, enter a cost element for calculated revenue.
For 68, 69, 70, 71, 72, enter cost elements for values to be calculated
with the <GL:POC_method>POC method</>.
For group 50, check all the cost elements not mentioned above.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KJ202
- Actual. todas las cl. de coste de period. (gp. &) con la trans. OKG2. ?Get instant SAP help. Start your 7-day free trial now.
KJ201
Seleccione período de periodificación (&) mayor que período de bloqueo &
¿Qué causa este problema? The results analysis period you entered is less than or equal to the <GL:cutoff_period>cutoff period</>. You ...
KJ200
Inicio de periodif. (antiguo: &) = El período & fue activado.
¿Qué causa este problema? The start of results analysis is usually the period in which the object was opened for which <DS:GLOS.WIP_calculation&...
KJ203
No utilizar el período & con la clase de periodificación &
¿Qué causa este problema? Time frame = A or B cannot be used with results analysis types L, S, or B.Respuesta del sistema El sistema emite un mens...
KJ204
Cl.cst. & p. period. autom. difiere de cl.cst. & p. period. manual.
¿Qué causa este problema? You have changed the assignment of line IDs to cost elements in Customizing for Results Analysis.Respuesta del sistema E...
Haga clic en este enlace para buscar todos los mensajes de SAP.