Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 173
Message text: No utilizar la base de valoración &1 con la base de beneficio &2
A valuation basis which uses current costs can only be used with profit
basis <ZH>C</>.
In the valuation method, use either a different valuation basis or a
different profit basis.
Note that a valuation basis which uses current costs can only be used
in results analysis for WBS elements.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KJ173
- No utilizar la base de valoración &1 con la base de beneficio &2 ?Get instant SAP help. Start your 7-day free trial now.
KJ172
Utilizar la base de valoración &1 sólo para elementos PEP
¿Qué causa este problema? A valuation basis which uses current costs can only be used with WBS elements.Respuesta del sistema El sistema emite un ...
KJ171
Posición &1: Actualizar las entradas temporales del plan de facturación
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
KJ174
Versión &1 no prevista para costes actualizados, modificar
¿Qué causa este problema? The version you entered for the updated costs in the valuation method in Customizing for results analysis cannot be used ...
KJ175
No utilizar base de valoración &1 con simulación "Real con Plan"
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
Haga clic en este enlace para buscar todos los mensajes de SAP.