Do you have any question about this error?
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 101
Message text: El elemento PEP & no está liberado para la factura en el proyecto &.
You are attempting to perform <DS:GLOS.results_analysis>results
analysis</> on <DS:GLOS.WBS_element>WBS element</> &v1& in
<DS:GLOS.project>project</> &v2&.
However, this WBS element is not a billing element.
This means that you cannot perform results analysis.
The system cannot perform the desired function.
Check whether you have entered the correct WBS element in project &v2&.
If you want to carry out results analysis on WSB element &v1&, you have
to change its master data and indicate that it is a
<DS:GLOS.billing_element>billing element</>.
<DS:TRAN.CJ12>Proceed</>
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KJ101
- El elemento PEP & no está liberado para la factura en el proyecto &. ?Get instant SAP help. Start your 7-day free trial now.
KJ100
La orden & no existe, verifique el núemro de orden
¿Qué causa este problema? The order you entered does not exist in the system.Respuesta del sistema El sistema emite un mensaje de error y no le pe...
KJ099
No existe esta posición, verifique las entradas
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
KJ102
El elemento PEP & no existe, verificar por favor las indicaciones.
¿Qué causa este problema? You are attempting to carry out results analysis on a WBS element that does not exist in the system.Respuesta del sistema...
KJ103
La orden & está marcada para borrado - ni WIP ni det.result. posible
¿Qué causa este problema? The order you selected is flagged for deletion. The order will be deleted during the next reorganization. You cannot carr...
Haga clic en este enlace para buscar todos los mensajes de SAP.