Do you have any question about this error?
Message type: E = Error
Message class: KI -
Message number: 148
Message text: Anule primero el documento de traspaso &1 de la imputación de actividad.
You want to reverse an activity allocation or a confirmation.
The corresponding document has already been reposted in CO by document
&V1&.
If the message is an error message, you must reverse the reposting
document.
<DS:TRAN.KB67>Execute</>
If the message is not an error message, check whether the reposting
document is still to be reversed. You only reverse this document and
not the CO reposting documents.
In Customizing, you can change this message from an error message to a
warning message or a note, or deactivate it. See the
<DS:SIMG.SIMG_CFMENUORK3OBA5>"Change message control"</> step (work
area "KI", message number "148") in the "General Controlling"
Implementation Guide (IMG).
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KI148
- Anule primero el documento de traspaso &1 de la imputación de actividad. ?Get instant SAP help. Start your 7-day free trial now.
KI145
Active los procesos empresariales de la sociedad CO &1 en &2.
¿Qué causa este problema? You assigned a <DS:DE.CO_PRZNR>business process</> although the <DS:DE.COABC>"Activity-Based Costi...
KI144
Active la cuenta de resultados de la sociedad CO &1 en &2.
¿Qué causa este problema? You have assigned to a profitability segment, although Profitability Analysis is not active in controlling area &V1&a...
KI149
Anular primero el documento de traspaso CO &2.
¿Qué causa este problema? You want to reverse a document. The corresponding document has already been reposted in CO by document &V1&.Respu...
KI151
El CeCo/cl.actividad &1/&2 tiene la cl.coste imput. &3 en lugar de &4
¿Qué causa este problema? You have entered the combination of cost center/activity type as the sender. Allocation cost element &V1& was det...
Haga clic en este enlace para buscar todos los mensajes de SAP.