Message type: E = Error
Message class: KF -
Message number: 026
Message text: Estado programa no válido al transferir csts.grales.-> véase txt.explic.
During the transfer of overhead to Profitability Analysis, an undefined
program status has occurred. Processing cannot be completed.
Diagnosis tools:
DIAG1 = "&v1&"
DIAG2 = "&v2&"
DIAG3 = "&v3&"
DIAG4 = "&v4&"
First check in OSS whether notes already exist for error message
<ZH>KF026</>. The problem might already have a solution defined for it.
Otherwise, create an OSS message and include in it the following
information:
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
How did the error situation arise?Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
KF025 Versión de emisor y receptor remiten a distintas vistas de valoración
¿Qué causa este problema? You tried to allocate planned costs from Overhead Cost Controlling (CO-OM) to Profitability Analysis (CO-PA). The sender ...
KF024 Imputación por per.desde CO-OM no se soporta con la valoración de CeBe
¿Qué causa este problema? You have executed a periodic allocation of overhead costs to CO-PA with the receiver version &V1&. This is assign...
KF027 P.esquema elementos &1, elemento csts.&2 no existe asignación a cpo.val.
¿Qué causa este problema? One of the following causes applies: No CO-PA value field has been assigned to cost component "&V2&" in...
KF028 En la sociedad PA &1 no está definido el campo valor &2
¿Qué causa este problema? Value field "&V2&" is assigned to cost component "&V4&" in cost component structure &...
Haga clic en este enlace para buscar todos los mensajes de SAP.