How To Fix KEO008 - No es posible el período de enlace &1 -&2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KEO - Enterprise Organization

  • Message number: 008

  • Message text: No es posible el período de enlace &1 -&2

  • Show details Hide details
  • ¿Qué causa este problema?

    You wish to create a link between objects "&V3&" and "&V4&", with a
    link period from &V1& to &V2&.

    Respuesta del sistema

    The link period is empty, and the system is unable to create the link.

    ¿Cómo arreglar este error?

    The selection date entered is often unsuitable. Therefore, choose
    another selection date, or extend the validity period for both of the
    objects until after &V1&.
    &NOTE&
    The link period for two objects is determined by the average validity
    period of both objects. However, the start of the link period may not
    be before the entered selection date (key date preference).

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP KEO008 - No es posible el período de enlace &1 -&2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker