How To Fix KEO008 - No es posible el período de enlace &1 -&2


KEO008 - Overview

  • Message type: E = Error

  • Message class: KEO - Enterprise Organization

  • Message number: 008

  • Message text: No es posible el período de enlace &1 -&2

  • Show details Hide details
  • ¿Qué causa este problema?

    You wish to create a link between objects "&V3&" and "&V4&", with a
    link period from &V1& to &V2&.

    Respuesta del sistema

    The link period is empty, and the system is unable to create the link.

    ¿Cómo arreglar este error?

    The selection date entered is often unsuitable. Therefore, choose
    another selection date, or extend the validity period for both of the
    objects until after &V1&.
    &NOTE&
    The link period for two objects is determined by the average validity
    period of both objects. However, the start of the link period may not
    be before the entered selection date (key date preference).

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


KEO008 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant