How To Fix KE349 - Valoración con cálculo coste material: Error en art."&1"


KE349 - Overview

  • Message type: E = Error

  • Message class: KE -

  • Message number: 349

  • Message text: Valoración con cálculo coste material: Error en art."&1"

  • Show details Hide details
  • ¿Qué causa este problema?

    In Profitability Analysis (CO-PA), the system tried to valuate a line
    item using the <ZH>future standard cost estimate</>.
    In order to determine the <ZH>future plan period</>, the system needs
    to read the valuation segment of the material master.
    The system has found that the future plan period is not filled for
    product <ZH>"&V1&"</> in plant <ZH>"&V2&"</>.

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    <DS:TRAN.MM03>Display material (View: Costing)</>
    The system looked for the material cost estimate using costing key
    <ZH>"&V3&"</>, as defined in the
    <DS:SIMG.SIMG_CFMENUORKEKE40>Customizing settings</> for CO-PA.

    Respuesta del sistema

    The document cannot be processed.

    ¿Cómo arreglar este error?

    Contact your system administrator.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


KE349 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author