How To Fix KD285 - Se ha anulado el status ENTR/CTEC tras la liquidación del período & &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KD - CO Settlement

  • Message number: 285

  • Message text: Se ha anulado el status ENTR/CTEC tras la liquidación del período & &

  • Show details Hide details
  • ¿Qué causa este problema?

    Either the sender is a production order or an internal order without
    revenues (or WBS element). This sender contains a results analysis key
    and you need to treat it as a WIP element.
    The sender is a production order.
    You either delivered or technically completed the production order
    during period &v1& &v2&, and then you settled it. You settled actual
    costs to Material or to a price difference account. Where necessary,
    you settled variances to Profitability Analysis.
    During the current settlement period &v3& &v4&, the production order
    is neither delivered, nor technically completed. This means that you do
    not have to settle any actual costs.
    The sender is a WIP element.
    The internal order (or WBS element) was technically closed during the
    period &v1& &v2&. It was also settled in this period. During
    settlement the actual costs were settled to the receiver of the
    settlement rule andthe WIP was broken down.
    However, during the current settlement period &v3& &v4&, the internal
    order (or WBS element) is not technically completed. This means that
    you cannot settle any actual costs.

    ¿Cómo arreglar este error?

    If you wish to settle actual costs and variances in this period too,
    then you need to make the corresponding settings as mentioned above.
    This enables the system to continue settlement of actual costs and of
    variances.
    Otherwise, you need to reverse the settlement of actual costs or
    variances in period &v1& &v2&. This enables the transfer of work in
    process to Financial Accounting, should the sender contain a results
    analysis key.
    Note, you can only reverse a settlement correctly if the current
    quantity stored in Material corresponds to the quantity stored at the
    time of settlement.

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    Example 1:
    Period 1 : Order delivers 10 pieces to warehouse
    Quantity stored: 10 pieces
    Period 2 : Order settlement for period 1 / Base quantity: 10 pieces
    Order delivery is reversed at a later date
    Quantity stored: 0 pieces
    Procedure in this case:
    1. Repeat delivery -> Quantity stored: 10 pieces
    2. Reverse settlement
    3. Repeat delivery reversal -> Quantity stored: 0 pieces
    Example 2:
    Period 1 : Order delivers 10 pieces to warehouse
    Quantity stored: 20 pieces
    Period 2 : Order settlement for period 1 / Base quantity: 10 pieces
    Order delivery is reversed
    Quantity stored: 10 pieces
    Procedure in this case:
    Settlement reversal is sufficient, since the quantity stored >= the
    base quantity of the order.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP KD285 - Se ha anulado el status ENTR/CTEC tras la liquidación del período & & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant