How To Fix J2567 - &4 Para un flujo de pagos no se ha podido determinar la fecha de fin


SAP Error Message - Details

  • Message type: E = Error

  • Message class: J2 - Message Class for Development Class JBT

  • Message number: 567

  • Message text: &4 Para un flujo de pagos no se ha podido determinar la fecha de fin

  • Show details Hide details
  • ¿Qué causa este problema?

    A cash flow exists for this transaction for which no end date has been
    calculated. This date is the date of the last relevant flow in the
    entire cash flow.

    Respuesta del sistema

    The cash flow will be ignored for the purposes of periodization or
    residual margin calculation.

    ¿Cómo arreglar este error?

    Check the cash flow of the transaction.
    If no end date can be determined, this means that no relevant flows and
    no effective capital is available for the cash flow.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP J2567 - &4 Para un flujo de pagos no se ha podido determinar la fecha de fin ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker