How To Fix H1639 - No puede modificar período validez elementos presupuestarios reclasif.


H1639 - Overview

  • Message type: E = Error

  • Message class: H1 - Messages Used in HR Funds and Position Management

  • Message number: 639

  • Message text: No puede modificar período validez elementos presupuestarios reclasif.

  • Show details Hide details
  • ¿Qué causa este problema?

    The budget structure element in question was created as a result of
    another budget structure element being reclassified.
    Since the validity period of such a budget structure element is
    determined by the validity period of the reclassification rule, you
    cannot change the validity period in the budget structure element
    itself.

    Respuesta del sistema

    Unable to change validity period in budget structure element.

    ¿Cómo arreglar este error?

    Change the validity period of the reclassification rule. The validity
    period of the budget structure element will be adjusted automatically.

    Procedimiento para Administradoras de Sistemas

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP H1639 - No puede modificar período validez elementos presupuestarios reclasif. ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author