Message type: E = Error
Message class: GRPG - Grouping/Pegging for Individual Project Planning
Message number: 110
Message text: Una asignación unívoca a un elemento PEP de planif.de nec.no es posible
WBS element &v1& could not be assigned uniquely to a grouping WBS
element. &v1& has been assigned to several grouping elements
simultaneously with the same validity (plant/MRP group).
INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TX
Check the entries for WBS element in the assignment table and make sure
that all the grouping WBS elements, to which &v1& has been assigned,
differ in the validity table in their assignment to a plant/MRP group.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
GRPG110
- Una asignación unívoca a un elemento PEP de planif.de nec.no es posible ?Get instant SAP help. Start your 7-day free trial now.
GRPG103
El grupo de planif.de nec.&1 no es relevante p.agrupamiento necesidades
¿Qué causa este problema? You have tried to use MRP group &v1& for a validity area. This is not allowed, as long as the MRP group has not b...
GRPG102
Ya existen asignaciones de origen a &
¿Qué causa este problema? WBS element &V2& can no longer be changed, since there are pegs for replenishment element &v1&.Respuesta ...
GRPG111
El elemento PEP & no es un elemento PEP de planificación de necesidades
¿Qué causa este problema? WBS element has not been marked as a <DS:GLOS.grouping WBS element>grouping WBS element</>, on which requirem...
GRPG112
Introducir elemento PEP para definición de proyecto &
¿Qué causa este problema? The component WBS element you entered belongs to a different project definition than the WBS element of the material comp...
Haga clic en este enlace para buscar todos los mensajes de SAP.