Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix GM043 - No se prevé la planificación de costes primarios en el centro coste &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GM - Combination manager

  • Message number: 043

  • Message text: No se prevé la planificación de costes primarios en el centro coste &

  • Show details Hide details
  • ¿Qué causa este problema?

    Cost center &V1& is blocked for primary cost planning. The block was
    set in the master record of this cost center for the period(s) &V2&.

    Respuesta del sistema

    Cost center &V1& is not included in planned distribution for the
    period(s) &V2&.

    ¿Cómo arreglar este error?

    If you want the cost center included in the planned distribution, you
    must cancel the block for the period.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP GM043 - No se prevé la planificación de costes primarios en el centro coste & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant