How To Fix FMBS124 - Imposible contabilizar imputación CP &1&2 en leger de contabilización


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FMBS - Budget structure

  • Message number: 124

  • Message text: Imposible contabilizar imputación CP &1&2 en leger de contabilización

  • Show details Hide details
  • ¿Qué causa este problema?

    The budget structure settings do not allow postings to FM account
    assignment &V1&&V2& for any of the posting ledgers (the posting ledger
    to be used was not known at the time of the check). The check of the
    budget structure ended with the return code &V3& for posting ledger 9A
    and with the return code &V4& for posting ledger 9B.
    The system recognizes the following return codes for the check of
    posting addresses:
    <ZH>Return code 1:</>
    The <DS:DE.FMBS_FLG_PO_CHECK>check of posting addresses</> is switched
    on. However the FM account assignment &V1&&V2& is missing in the budget
    structure. Insert this account assignment in the budget structure for
    the posting ledger &V3&.
    <ZH>Return code 2:</>
    The <DS:DE.FMBS_FLG_PO_CHECK>check of posting addresses</> is switched
    off, but the validation of posting addresses does not allow posting on
    this address. Check the implementation of the Business Add-In (BAdI)
    <DS:SIMG.FMBS_VALID_ADDRESS>Validate Budget and Posting Addresses in BS
    </>.
    <ZH>Return code 3:</>
    The FM account assignment &V1&&V2& leads to a conflict when defining a
    <DS:DE.FMKU_GROUPING_KEY>grouping key</> within the context of the
    budget structure. Check the implementation of the Business Add-In (BAdI)
    <DS:SIMG.FMKU_GROUPING_KEY>Define Grouping Key</>.
    <ZH>Return code 4:</>
    The derivation strategy used for deriving the budget address from the
    posting address derives an invalid budget address. You can use the
    program for <DS:TRAN.FMBS_STAT>displaying of budget structure settings
    </> to find out which derivation strategy is used. Check the
    <DS:SIMG._ISPSFM_N_DERIVE_BO> Derivation Strategy for BudgetAddresses</>
    in Customizing. This error may also be caused by inconsistent
    customizing of active FM account assignment elements in BCS and FM. This
    can be checked in IMG activity <DS:SIMG._ISPSFM_N_V_FMDIMSTA>Activate
    Account Assignment Elements in Budget Control System</>.

    Respuesta del sistema

    Processing stops.

    ¿Cómo arreglar este error?

    Check the budget structure settings according to the given return code.

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    Procedimiento para Administradoras de Sistemas


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP FMBS124 - Imposible contabilizar imputación CP &1&2 en leger de contabilización ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author