Do you have any question about this error?
Message type: E = Error
Message class: FAGL_SWITCH_LEAD_LDG - Technical Changeover of Leading View in General Ledger (New)
Message number: 112
Message text: Existen documentos específicos ledger del componente tesorería/préstamo
You want to switch the leading ledger.
However, the system contains ledger-specific documents for the <LS>
Treasury and Risk Management (TRM)</> and/or <LS>Loans Management
(FS-CML)</> components.
If this message appears as an error message, you <ZH>cannot</> carry out
a project for switching the leading ledger.
However, after carefully considering the effects and risks, you can
change the message type from <LS>error</> to <LS>warning</> (see section
"&SYS_ADMIN&").
If you are using the <LS>Treasury and Risk Management (TRM)</> and/or
<LS>Loans Management (FS-CML)</> components productively with a ledger
solution (that is, the values are updated in parallel ledgers), it is
<ZH>not</> possible to switch the leading ledger due to the architecture
of the <LS>Treasury and Risk Management (TRM)</> and <LS>Loans
Management (FS-CML)</> components on one hand and the <LS>Financial
Accounting (FI)</> component on the other.
This is because the leading ledger is used as an operational paying
ledger and a paying valuation area is defined in the transaction manager
of TRM. In the case of a switch of the leading valuation, time-dependent
changes would have to be made to this setting from the date of the
switch. However, this is <ZH>not</> possible when the leading ledger is
switched.
INCLUDE FAGL_MESSAGE_CONTROL OBJECT DOKU ID TX
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
FAGL_SWITCH_LEAD_LDG112
- Existen documentos específicos ledger del componente tesorería/préstamo ?Get instant SAP help. Start your 7-day free trial now.
FAGL_SWITCH_LEAD_LDG111
El fin del ejercicio &1 difiere: &2 &3
¿Qué causa este problema? Different fiscal year variants are defined for the ledgers to be switched. The end of the fiscal year &V1& is def...
FAGL_SWITCH_LEAD_LDG110
El inicio del ejercicio &1 difiere: &2 &3
¿Qué causa este problema? Different fiscal year variants are defined for the ledgers to be switched. The start of the fiscal year &V1& is d...
FAGL_SWITCH_LEAD_LDG113
Escenario &1 no está asignado al ledger &2
¿Qué causa este problema? Scenario &V1& is assigned in the leading ledger but not in the future leading ledger &V2&. Technically, y...
FAGL_SWITCH_LEAD_LDG114
No es posible cambiar el ledger principal; FI-AA (neuvo) no activo
¿Qué causa este problema? In order for you to change the leading ledger, the following prerequisites in <LS>Asset Accounting</> (FI-AA)...
Haga clic en este enlace para buscar todos los mensajes de SAP.