Do you have any question about this error?
Message type: E = Error
Message class: EQ - Cross-IS-U functions
Message number: 279
Message text: Error interno al determinar fin período cálculo p.instalación &1
In move-out processing the system checks that the move-out date is in a
period that has already been billed. An error occurred during this
check.
You can view the error message in the error log.
INCLUDE ISU_VERARB OBJECT DOKU ID TX
INCLUDE NA_SYSADMIN1 OBJECT DOKU ID TX LANGUAGE E
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
EQ279
- Error interno al determinar fin período cálculo p.instalación &1 ?Get instant SAP help. Start your 7-day free trial now.
EQ278
Se ha producido un error al leer el punto de suministro &1 (contrato &2)
¿Qué causa este problema? An internal error has occurred for data collection of move-out processing while reading a premise. The error description ...
EQ277
Cancelada la verif.del doc.baja instalación p.núm.&1
¿Qué causa este problema? An internal error has occurred while checking for a move-out document. The error is explained in detail in an additional ...
EQ280
Existe fecha baja de instalación &1 en doc.&2 (contrato &4)
¿Qué causa este problema? The entered move-out date is too far in the past.Respuesta del sistema Move-out processing is not possible.¿Cómo arreg...
EQ281
La fecha baja instalación &1 del doc.&2 (contrato &3) es posterior a &4
¿Qué causa este problema? The entered move-out date is too far in the future.Respuesta del sistema Move-out processing is not possible.¿Cómo arr...
Haga clic en este enlace para buscar todos los mensajes de SAP.