Do you have any question about this error?
Message type: E = Error
Message class: EQ - Cross-IS-U functions
Message number: 251
Message text: Fecha de baja instalación &1 p.contrato &2 no permitida
You have either not entered a move-out date for the contract, or you
have entered a move-out date for which move-out processing is not
permitted. For example, the date 31.12.9999 is not a permissible date.
A permissible move-out date is required.
Enter a permissible move-out date.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
EQ251
- Fecha de baja instalación &1 p.contrato &2 no permitida ?Get instant SAP help. Start your 7-day free trial now.
EQ250
En la verif.fecha baja instalación p.contrato &1 se ha producido un error
¿Qué causa este problema? An internal error has occurred in the data collection of move-out processing. The move-out date of the various contracts ...
EQ249
Fecha baja instalación &1 y fecha de baja &2 demasiado lejanas entre sí
¿Qué causa este problema? The dates entered for the contracts involved in the move-out are different. You have specified two dates that are more th...
EQ252
La fe.baja instalación &1 p.contrato &2 no es posterior a fe.alta &3
¿Qué causa este problema? You have attempted to enter a move-out with a move-out date that is earlier than move-in date of the contract.Respuesta d...
EQ253
La fe.baja instalac.&1 p.instalac.&2 es anterior al alta posterior &3
¿Qué causa este problema? You have attempted to enter a move-in and move-out for an installation together. This move-in/out is not suitable for the...
Haga clic en este enlace para buscar todos los mensajes de SAP.