Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 402
Message text: La operación ya está planificada
You try to dispatch an operation that already has the status
<ZH>dispatched</>.
You cannot dispatch items.
Either deallocate the operation first of all or reschedule the operation
for example on the planning table with "drag and drop".
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CY402
- La operación ya está planificada ?Get instant SAP help. Start your 7-day free trial now.
CY401
No se puede visualizar la necesidad de capacidades
¿Qué causa este problema? You cannot display the capacity requirements for the operation since the value exceeds the length of the display field.Re...
CY400
No se puede asignar directamente el registro de particiones restantes
¿Qué causa este problema? You are trying to assign the remaining split, which contains information on remaining requirements after a partial split,...
CY403
La partición no está asignada
¿Qué causa este problema? You are trying to dispatch a split that has not been assigned.¿Cómo arreglar este error? First assign the split and th...
CY404
No está previsto el borrado de particiones restantes
¿Qué causa este problema? You are trying to delete the remaining split that contains the remaining requirements after an incomplete split of the ca...
Haga clic en este enlace para buscar todos los mensajes de SAP.