Do you have any question about this error?
Message type: E = Error
Message class: CRM_PS_ELD - Messages from Eligibility Determination
Message number: 212
Message text: Se especificó interrupción período admisibilidad de &1 día(s): &2 - &3 &4
Process consistency check has detected one or multiple error(s) during
the eligibility determination (validity check).
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Proceed as follows:
If you are using eligibility periods that you have defined manually,
check that your entries are valid.
If you are using automatic eligibility period determination, contact
your system administrator.
Check the eligibility determination in your corresponding BRFplus rule
or in the active BAdI implementation of <NP>CRM_PS_ELD_BADI</>.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CRM_PS_ELD212
- Se especificó interrupción período admisibilidad de &1 día(s): &2 - &3 &4 ?Get instant SAP help. Start your 7-day free trial now.
CRM_PS_ELD211
Período de admisibilidad &1 - &2 no corresponde a período determ.&3 - &4
¿Qué causa este problema? Process consistency check has detected one or multiple error(s) during eligiblity determination (validity check)Respuesta...
CRM_PS_ELD210
Período de admisibilidad de &1 - &2 es inconsistente
¿Qué causa este problema? Process consistency check has detected one or multiple error(s) during eligiblity period determination (validity check)Re...
CRM_PS_ELD213
Superposición de '&1' períodos de condición previa de &2 a &3 &4
¿Qué causa este problema? The consistency check has detected one or multiple error(s) caused by existing overlapping eligibility periods. An overla...
CRM_PS_ELD214
La determinación de los períodos de admisibilidad ha fallado
¿Qué causa este problema? The determination of automatic eligibility periods (using a BRFplus rule or BAdI implementation) or the definition of man...
Haga clic en este enlace para buscar todos los mensajes de SAP.