Do you have any question about this error?
Message type: E = Error
Message class: CRM_LEASING_CHANGE - Messages for Changes to Leases
Message number: 161
Message text: Período de validez no es posible; debe mantenerse antiguo período validez
You specified &V2& &V3& as the term for change process number &V1& at
item level. With the specified start date, however, and considering the
interm period, the term has to be &V4& &V3&.
According to the Customizing settings for change processes, only this
term is possible.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Change either the start date or the term such that the start date +
interim period + term corresponds to the term of the old contract.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CRM_LEASING_CHANGE161
- Período de validez no es posible; debe mantenerse antiguo período validez ?Get instant SAP help. Start your 7-day free trial now.
CRM_LEASING_CHANGE160
Verificar el enlace con otras posiciones
¿Qué causa este problema? According to the Customizing settings, change process &V3& with number &V1& at item level cannot be linke...
CRM_LEASING_CHANGE159
Período de validez no es posible; debe mantenerse antiguo período validez
¿Qué causa este problema? You entered &V2& &V3& as the term for change process &V1& at item level (upgrade co-terminus). Wi...
CRM_LEASING_CHANGE162
Fecha de inicio diferente al repartir el contrato por cantidad
¿Qué causa este problema? The start date of item change process number &V1& (process &V2&) differs from the start date of change pr...
CRM_LEASING_CHANGE163
Este proceso modificación sólo se determina para el uso interno
¿Qué causa este problema? The system cannot execute change process number &V2& at item level. Change process &V1& is only used inte...
Haga clic en este enlace para buscar todos los mensajes de SAP.