How To Fix CP808 - No se ha considerado el material configurable & centro &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 808

  • Message text: No se ha considerado el material configurable & centro &

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to schedule routings and then copy the resulting internal
    processing times into the material master. However, material &V1& in
    plant &V2& is configurable. You assign so-called "super" routings to
    configurable materials. In scheduling these super-routings do not
    produce realistic internal processing times.

    ¿Cómo arreglar este error?

    Do not update the material masters of configurable naterials using
    scheduling.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CP808 - No se ha considerado el material configurable & centro & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker