How To Fix CP330 - Operación: fecha: &: número de operación erróneo


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 330

  • Message text: Operación: fecha: &: número de operación erróneo

  • Show details Hide details
  • ¿Qué causa este problema?

    The smallest operation number is less than the operation number before
    the branch operation in the standard sequence.
    However, the first operation in alternative or parallel sequences must
    have a number greater than the number of the operation before the
    branch operation. number of the branch operation in the standard
    sequence.

    ¿Cómo arreglar este error?

    Check the task list and
    correct the operation numbers in sequence &V3&
    <ZH>or</>
    correct the operation numbers in the standard sequence

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CP330 - Operación: fecha: &: número de operación erróneo ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author