Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CN751 - Material & no está previsto para necesidades primarias planificadas


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 751

  • Message text: Material & no está previsto para necesidades primarias planificadas

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to generate planned independent requirements for a material,
    but the material does not allow this.

    Respuesta del sistema

    The system generates a normal reservation for the material.

    ¿Cómo arreglar este error?

    If you want to generate planned independent requirements for a material
    check the settings in the material master - MRP views.
    The strategy group must permit <LS>planning at assembly level</>
    The mixed MRP must permit <LS>assembly planning</>

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CN751 - Material & no está previsto para necesidades primarias planificadas ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant