How To Fix CM104 - Colisión número modificación en cabecera list de materiales


CM104 - Overview

  • Message type: E = Error

  • Message class: CM - Task list messages: Material component allocations

  • Message number: 104

  • Message text: Colisión número modificación en cabecera list de materiales

  • Show details Hide details
  • ¿Qué causa este problema?

    You are attempting to change a task list or a standard network with a
    change number and you also want to change the bill of material assigned
    to it. However, the bill of material header was already changed with a
    different change number which has the same valid-from date as the
    change number from your task list.
    Therefore, you cannot change the bill of material header.

    ¿Cómo arreglar este error?

    Change your task list or standard network with a different change
    number. Note the valid-from date of the change number.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CM104 - Colisión número modificación en cabecera list de materiales ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author