Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CKMLVNB052 - La contabilización de cierre para el material &1 &2 ya se ha efectuado


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CKMLVNB - Revaluation of Consumption

  • Message number: 052

  • Message text: La contabilización de cierre para el material &1 &2 ya se ha efectuado

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to revaluate consumption for material &v1&, with movement type
    &v2& in valuation area &v3&. In order to do this you have entered the
    periods to be calculated.
    You have already made closing entries for this material in the periods
    concerned.

    Respuesta del sistema

    The System does not allow you to revaluate consumption for this
    material.

    ¿Cómo arreglar este error?

    If you want to revaluate consumption for the material, you must reverse
    the closing entries already made for the material in this period first.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CKMLVNB052 - La contabilización de cierre para el material &1 &2 ya se ha efectuado ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant