How To Fix CKMLVNB052 - La contabilización de cierre para el material &1 &2 ya se ha efectuado


CKMLVNB052 - Overview

  • Message type: E = Error

  • Message class: CKMLVNB - Revaluation of Consumption

  • Message number: 052

  • Message text: La contabilización de cierre para el material &1 &2 ya se ha efectuado

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to revaluate consumption for material &v1&, with movement type
    &v2& in valuation area &v3&. In order to do this you have entered the
    periods to be calculated.
    You have already made closing entries for this material in the periods
    concerned.

    Respuesta del sistema

    The System does not allow you to revaluate consumption for this
    material.

    ¿Cómo arreglar este error?

    If you want to revaluate consumption for the material, you must reverse
    the closing entries already made for the material in this period first.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CKMLVNB052 - La contabilización de cierre para el material &1 &2 ya se ha efectuado ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author