Do you have any question about this error?
Message type: E = Error
Message class: CKBK - Messages of the Valuation Functions
Message number: 036
Message text: Período CC de &1 a &2 no válido
The cost estimate contains a sub-costing having a validity period from
&v3& to &v4& which does not fall within the validity period for this
cost estimate from &v1& to &v2&.
The validity period is not changed.
First change the validity period of the sub-costing.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CKBK036
- Período CC de &1 a &2 no válido ?Get instant SAP help. Start your 7-day free trial now.
CKBK035
Período reparto costes de &1 a &2 no válido
¿Qué causa este problema? The distribution period from &v1& to &v2& for the costs of the costing item does not fall within the vali...
CKBK034
Período CC de &1 a &2 no válido
¿Qué causa este problema? The validity period of the costing from &v1& to &v2& must fall within the validity period from &v3&am...
CKBK037
Posición CC &3 no se valora con estratificación
¿Qué causa este problema? It is not possible to transfer the cost component split of cost component structure &v1& to the cost component st...
CKBK038
Transf.estratif.costes/estratif.costes prim.
¿Qué causa este problema? When you valuate costing item &v3& the referenced cost component split (cost component structure &v1&) is...
Haga clic en este enlace para buscar todos los mensajes de SAP.