Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 735
Message text: No existe ningún cálculo del coste de la alternativa de aprovisionamiento
For material/plant &v1&, no cost estimate could be found for the
<DS:GLOS.352A616EC1035CD5E10000009B38F974>procurement alternative</>
with BOM &v2& and routing &v3&.
There are various possible causes for this, as follows:
You have not created a procurement alternative for
<DS:GLOS.3526C3F9AFAB52B9E10000009B38F974>BOM</> &V2& and
<DS:GLOS.3528EE4BEB4D21BCE10000009B38F984>routing</> &V2&.
Example:
At the beginning of the year, you create a
<DS:GLOS.3526B72EAFAB52B9E10000009B38F974>mixed cost estimate</> with
procurement alternatives A und B. Procurement alternative A includes
BOM 1 and routing 1, while procurement alternative B includes BOM 2 and
routing 2. During the fiscal year, you enter BOM 3 and routing 3, for
which you create a <DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product
cost collector</>. When calculating actual costs at period-end closing
in Cost Object Controlling, the system attempts to access the cost
estimate for the procurement alternative. However, there is no
procurement alternative containing BOM 3 and routing 3.
A cost estimate was not created for BOM &V2& and routing &V3&. The
reason for this is that the lot size range entered in the
<DS:GLOS.3526C3FAAFAB52B9E10000009B38F974>alternative BOM</> does not
agree with the lot size entered in the procurement alternative.
Example:
The ratio between procurement alternative A and procurement alternative
B in a mixed cost estimate for material X should be 1:9.
Procurement alternative A contains
<DS:GLOS.3526C404AFAB52B9E10000009B38F974>BOM usage</> 1, alternative
BOM 1, <DS:GLOS.3526C3C6AFAB52B9E10000009B38F974>task list type</> N,
<DS:GLOS.3526C3C2AFAB52B9E10000009B38F974>task list group</> 1, and
<DS:GLOS.3526BEB7AFAB52B9E10000009B38F974>group counter</> 1.
A lot size range of 100 - 1000 has been entered for alternative BOM 1.
No lot size has been entered in the procurement alternative.
Procurement alternative B contains BOM usage 2, alternative BOM 2, task
list type N, task list group 2, and group counter 1.
A lot size range of 1 - 100 has been entered for alternative BOM 2. No
lot size has been entered in the procurement alternative.
You create a mixed cost estimate for the material with a lot size of 1.
The system costs routing 2 / BOM 2. Routing 1, BOM 1 is not costed,
because the lot size range of the BOM usage does not correspond to the
costing lot size of the procurement alternative. Procurement
alternative A has a cost estimate for BOM 2 and routing 2, and no cost
estimate for BOM 1 and routing 1.
This would also occur if a lot size of 500 were entered in procurement
alternative A, and the costing lot size of the procurement alternative
were 100.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Check to see whether a cost estimate already exists for the procurement
alternative.
Check the lot sizes in the alternative BOM and in the procurement
alternative.
If necessary, create a procurement alternative and/or a cost estimate
for the procurement alternative.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK735
- No existe ningún cálculo del coste de la alternativa de aprovisionamiento ?Get instant SAP help. Start your 7-day free trial now.
CK734
Existe una inconsistencia en cálculo mixto coste del material & centro &
¿Qué causa este problema? When referencing a cost estimate for material &v1& in plant &V2&, the cost estimate for procurement alter...
CK733
El cálculo del coste sólo es posible tras haber grabado
¿Qué causa este problema? Although configurable material &v1& has been valuated, it has not yet been saved. This component cannot therefore...
CK736
No existe ningún cálculo del coste de la alternativa de aprovisionamiento
¿Qué causa este problema? For material/plant &v1&, no cost estimate could be found for the <DS:GLOS.352A616EC1035CD5E10000009B38F974>...
CK737
El co-producto & del centro & no se crea mediante el material proceso &