Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 696
Message text: Esq.reparto & para material & en centro & sin asignaciones válidas
The <DS:GLOS.apportionment_structure>apportionment structure</> &V1&
determined for material &V2& in plant &V3& does not have valid
assignments for the equivalence numbers.
The equivalence numbers all have a temporal validity, and are before
&V4&.
The material cost estimate is executed with errors.
Change the <DS:DE.CSPLIT>apportionment structure</> &V1& in the
material master of material &V2& in plant &V3&, or make sure that a
valid apportionment structure is found.
The <DS:GLOS.quantity_structure_date>quantity structure date</> for the
cost estimate must be before the <LS>Valid-to date</> in the
apportionment structure. In addition, the quantity structure date must
not be the same as the <LS>Valid-to date</>.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK696
- Esq.reparto & para material & en centro & sin asignaciones válidas ?Get instant SAP help. Sign up for our Free Essentials Plan.
CK695
Operación/Suboperación &2: Sin cantidad -> sin costes
¿Qué causa este problema? The quantity of item &V1& in the itemization is zero. Consequently, the costs of this internal activity are also ...
CK694
No se ha podido determinar ning.estratif.para actividad interna &1 (&2)
¿Qué causa este problema? The system could not determine a cost component split for the internal activity with <DS:GLOS.activity_type>activit...
CK697
El cálculo del coste plan ya ha sido liberado
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
CK698
CC de referencia para mat.& en centro & no tiene info detallada
¿Qué causa este problema? In order to cost material &V1& in plant &V2&, an <DS:GLOS.itemization>itemization</> must exi...
Haga clic en este enlace para buscar todos los mensajes de SAP.