Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 642
Message text: Material &2: para determinación de interlocutor se utiliza un CeBe dummy
<DS:GLOS.3526B73AAFAB52B9E10000009B38F974>Partner version</> &V1&
requires a profit center to be determined. However, no profit center is
assigned to material &V2& in plant &V3&.
&system_response&
To determine the partner, the dummy profit center is used from
controlling area &V4&.
Assign a profit center to material &V2& in plant &V3& if you do not
want the dummy profit center to be assigned.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
<DS:TRAN.MM02>Change material</>Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK642
- Material &2: para determinación de interlocutor se utiliza un CeBe dummy ?Get instant SAP help. Start your 7-day free trial now.
CK641
Material &2: no ha sido posible determinar ningún centro beneficio
¿Qué causa este problema? Partner version &V1& requires a profit center to be determined. However, no profit center is assigned to material...
CK640
EL cálculo del coste marcado ya no se puede volver a modificar
¿Qué causa este problema? A marked cost estimate for this order item already exists in the database; it may have been used to valuate sales order o...
CK643
Nº mat.&2: no ha sido posible determinar ninguna división
¿Qué causa este problema? <DS:GLOS.3526B73AAFAB52B9E10000009B38F974>Partner version</> &V1& requires a business area to be dete...
CK644
Para el material &1 en el centro &2 se utiliza el esquema de reparto &3
¿Qué causa este problema? The joint production process is costed using material &V1& in plant &V2&. However, there are no productio...