Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 464
Message text: Para material & centro & se ha tomado tamaño lote de vista CC
In sales order costing, the lot size for individual requirements
materials should be determined dynamically. You specified this in
Customizing for Product Cost Controlling with the <DS:DE.CK_LOSDR>Pass
on lot size</> indicator.
The <DS:DE.SBDKZ>secondary requirements indicator</> &V3& in the MRP 2
view of the master record of material &V1& in plant &V2& is set.
Although material &V1& is controlled by individual requirements, there
is a higher-level material in the structure that is controlled by
collective requirements.
The system uses the costing lot size in the costing view of the master
record of material &V1&.
Check whether the secondary requirements indicator &V3& in the material
master record is correct.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK464
- Para material & centro & se ha tomado tamaño lote de vista CC ?Get instant SAP help. Start your 7-day free trial now.
CK463
La ejec. CC no apoya la función 'transferir tamaño de lote'
¿Qué causa este problema? You have selected costing variant &v1& for the costing run. The <DS:DE.CK_LOSDR>Pass on lot size</> i...
CK462
Puesto de trabajo & seleccionado no concuerda con ID sel. &.
¿Qué causa este problema? The type, status and/or usage of the selected routing &V1& does not match selection ID &V2&.Respuesta del...
CK465
Para material/lote &1 centro &2 no se han podido determinar precios
¿Qué causa este problema? The system could not calculate a price for material/batch &v1& in plant &v2& for <DS:GLOS.valuation_vi...
CK466
Para el trabajo interno &1 &2 no se ha podido determinar ningún precio
¿Qué causa este problema? The system could not calculate a price for the internal activity with activity type &v1& of cost center &v2&a...
Haga clic en este enlace para buscar todos los mensajes de SAP.