Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 394
Message text: Para la ejecución CC & & no se ha realizado aún un cálculo del coste
To be able to write future standard prices to the material master
record with the costing run, cost estimates have to have been created
with this costing run.
No release is carried out for this costing run.
First cost the materials that were selected with the costing run, and
then carry out release.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK394
- Para la ejecución CC & & no se ha realizado aún un cálculo del coste ?Get instant SAP help. Start your 7-day free trial now.
CK393
Para los materiales configurables, se ignora la clase de aprov. esp. &
¿Qué causa este problema? The configurable material &V2& in plant &V3& is set for special procurement.Respuesta del sistema Specia...
CK392
Se ha(n) encontrado cálculo(s) del coste para otra variante CC
¿Qué causa este problema? During the search for cost estimates for the costing variant &V1&, the system found that there are cost estimates...
CK395
No se ha podido tomar un cálculo del coste plan futuro adecuado
¿Qué causa este problema? For material &v1& in plant &v2&, the system tries to find a future standard cost estimate according to th...
CK396
No existe estratif. costes a pesar de que existen datos de cabecera CC
¿Qué causa este problema? Inconsistency in the database. For the material &V1& in plant &V2&, the header of a cost estimate was fou...
Haga clic en este enlace para buscar todos los mensajes de SAP.