Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 329
Message text: El Release & aún no apoya la fecha de necesidades
You are trying to use the requirements date as a default date for the
other costing dates. This is not supported in Release &V1&.
Instead of the requirements date, the system uses the current date.
If you do not want to use the current date, and you have authorization
for Customizing for Product Cost Planning, you can change date control
&v3&.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK329
- El Release & aún no apoya la fecha de necesidades ?Get instant SAP help. Start your 7-day free trial now.
CK328
La vista & no existe (verifique su parametrización)
¿Qué causa este problema? The user-dependent settings for the detail screen defined without reference to a costing variant, refer to view &V1&a...
CK327
La vista & no existe (verifique su parametrización)
¿Qué causa este problema? The user-dependent settings for the detail screen for costing variant &V2& refer to view &V1&. This view...
CK330
La parametrización para las fechas de cálculo es inconsistente
¿Qué causa este problema? The default values for &V1& and &V2& are set incorrectly. The date default for &V1& points (indir...
CK331
Se ha fijado 'Fecha de cálculo hasta' en fin del período &
¿Qué causa este problema? A standard cost estimate must be valid at least until the end of the period in which the <ZH>Costing date from</...
Haga clic en este enlace para buscar todos los mensajes de SAP.