Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 154
Message text: Estrategia de valoración de material no vale para la variante cálculo &
The system attempted to find the price for a material using strategy
&v2& in the <DS:GLOS.valuation_variant>valuation variant</>.
This strategy specifies that valuation is to use manually entered cost
components (i.e., from a manual cost estimate). However, the settings
in <DS:GLOS.costing_variant>costing variant</> &v1& are such that
additive cost estimates are not included.
The system could not determine a price for the material.
If you have authorization for Customizing, do the following:
Check costing variant &v1&.
<DS:SIMG.SIMG_CFMENUORKKOKKN>Check costing variant</>
Check the strategy for material valuation in the valuation variant
assigned to this costing variant
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CK154
- Estrategia de valoración de material no vale para la variante cálculo & ?Get instant SAP help. Start your 7-day free trial now.
CK153
Cálculo del coste marcado
¿Qué causa este problema? The results of the standard cost estimate were written to the material master record as the future standard price.Respues...
CK152
Cálculo del coste marcado, pero el material no tiene datos contables
¿Qué causa este problema? The results of the standard cost estimate will be written to the material master record as the future standard price. How...
CK155
Material no contiene CC plan
¿Qué causa este problema? You want to <DS:GLOS.release>release</> a standard cost estimate for a material. The system has established t...
CK156
Sociedad &1: La liberación se lleva a cabo demasiado tarde
¿Qué causa este problema? Company code &v1&: The end of period &v2& is &v3&. This, however, has been exceeded. Only cost es...
Haga clic en este enlace para buscar todos los mensajes de SAP.