Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CC141 - Número de modif. &: & colisiona con el número modif. existente


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CC - ECM: Messages

  • Message number: 141

  • Message text: Número de modif. &: & colisiona con el número modif. existente

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to carry out a date shift.
    When you carry out a date shift, the system re-defines the valid-from
    date for each effectivity period of the objects linked to the change
    master.
    This process would change the sequence of effectivity periods of BOM
    &V2&, alternative &V3& on &V1&.

    Respuesta del sistema

    The system checks whether the BOM is still consistent after a date
    shift. This is not the case if, for example, the BOM has already been
    changed using a change number with the new valid-from date you want to
    shift to.

    ¿Cómo arreglar este error?

    As the BOM will no longer be consistent if the date shift is carried
    out, you cannot carry out the date shift.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CC141 - Número de modif. &: & colisiona con el número modif. existente ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker