Do you have any question about this error?
Message type: E = Error
Message class: CC - ECM: Messages
Message number: 073
Message text: La fecha no se puede desplazar al &
You want to change the valid-from date of a change master.
You cannot do this, because the consistency of at least one change
object (for example, BOM, or routing) is violated or the object(s) are
currently locked.
The following reasons for inconsistency may apply:
A BOM has already been changed using a change number with the same
valid-from date as the selected date &V1&.
A routing is not valid on the selected date &V1&.
The system produces a message log listing the change objects that
prevent a date shift.
If you confirm this message, you can enter a new date in the <LS>Date
shift</> dialog box or cancel the date shift function.
If you cancel the date shift function, you see a pushbutton for the
special message log for the change objects that prevent a date shift.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CC073
- La fecha no se puede desplazar al & ?Get instant SAP help. Start your 7-day free trial now.
CC072
No existe validez
¿Cómo arreglar este error? Inform your system manager.Extracto de mensaje de error del sistema SAP. Copyright SAP SE. ...
CC071
No existen modficaciones para el número de modificación &
¿Qué causa este problema? No changes have been made with this change number. The changes made have been undone with the undo change transaction. &a...
CC074
El desplazamiento de fecha modifica la secuencia
¿Qué causa este problema? You want to carry out a date shift for a change number. This change of valid-from date means that the sequence of effecti...
CC075
La fecha alternativa & ya existe
¿Qué causa este problema? You want to change the valid from date of a change master. At least one task list was changed with this change number. Da...
Haga clic en este enlace para buscar todos los mensajes de SAP.