Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CB530 - Gestión de pto inspección prevista. No se contabilizará entrada mercancía


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CB - PP-PI-PMA: Dialog Messages for Process Management

  • Message number: 530

  • Message text: Gestión de pto inspección prevista. No se contabilizará entrada mercancía

  • Show details Hide details
  • ¿Qué causa este problema?

    With the selected process message, a goods receipt for the order is
    reported to the destination &V1&. However, the system does not post a
    goods receipt since an inspection is to be carried out for for the
    corresponding process order using inspection points.

    Respuesta del sistema

    The material quantity reported in the process message is transferred to
    QM. It is used as a default value for the inspection point quantity
    during inspection processing.

    ¿Cómo arreglar este error?

    Manually post the goods receipt after you have assigned the inspection
    points to partial lots and, if necessary, the partial lots to batches
    in QM.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CB530 - Gestión de pto inspección prevista. No se contabilizará entrada mercancía ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author