How To Fix CACSSESTD091 - Planificación de liquidación para remuneración &2 no modificará plan &1


CACSSESTD091 - Overview

  • Message type: E = Error

  • Message class: CACSSESTD - Settlement Scheduling - Transaction Data

  • Message number: 091

  • Message text: Planificación de liquidación para remuneración &2 no modificará plan &1

  • Show details Hide details
  • ¿Qué causa este problema?

    The system has been instructed to recalculate the settlement schedule
    for remuneration &SYST-MSGV2&. Recalculation is necessary due to at
    least one of the following:
    Settlement schedule &SYST-MSGV1& has been changed since its creation
    <ZH>or</>
    Scheduling rule to be applied is not identical (including version) with
    the rule used when the settlement schedule was created <ZH>or</>
    Attributes of the remuneration line (database fields) are not identical
    to the attributes that would be used based on current information.
    After scheduling settlement of remuneration &SYST-MSGV2&, the system
    has determined that the result is identical with the existing settlement
    schedule &SYST-MSGV1&.

    Respuesta del sistema

    The existing settlement schedule &SYST-MSGV1& remains unchanged.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


CACSSESTD091 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author