Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CACSSESTD021 - Error al preparar la numeración temporal del plan de liquidación


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CACSSESTD - Settlement Scheduling - Transaction Data

  • Message number: 021

  • Message text: Error al preparar la numeración temporal del plan de liquidación

  • Show details Hide details
  • ¿Qué causa este problema?

    As part of the settlement scheduling, a new settlement schedule is to be
    assigned a temporary number <ZK>$nnnnnnnnn</>. The temporary number is
    replaced by another number only when the posting is made in the
    database. This number is taken from a number range from the number range
    object CACS_SES.
    An error occurred when the system attempted to assign a temporary
    number. There has either been a field overflow, or the temporary number
    has been generated incorrectly. This means that the settlement
    scheduling cannot be continued for the current remuneration.

    ¿Cómo arreglar este error?

    Contact your system administrator for an analysis and solution of the
    problem.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CACSSESTD021 - Error al preparar la numeración temporal del plan de liquidación ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker