    You are attempting to set the <ZH>scheduling</> and/or <ZH>capacity
    planning</> indicators for several scheduling levels. Please note the
    following:
    Because rough-cut, rate-based and detailed planning levels are entirely
    different and production orders can only be updated on the detailed
    planning level, problems may occur when calculating capacity
    requirements.
    If you convert a planned order into a production order, only the
    detailed planning view is updated when you make changes in the
    production order. In detailed planning, the capacity requirements
    calculated for rate-based planning are the same as they were for the
    last planning status for rate-based scheduling of the planned order.
    Setting the indicators for several scheduling levels means that an
    order is scheduled at each level which causes a decrease in
    performance. If possible, set the indicator for only one scheduling
    level.

    ¿Cómo arreglar este error?

    If you want to schedule on several different levels at the same time,
    you have to set the parameters for capacity planning and scheduling in
    such a way that only one scheduling level is used to determine the
    order basic dates.
    If you already set the <ZH>scheduling</> and/or <ZH>capacity
    planning</> indicators for
    rate-based scheduling and now you want to set them for detailed
    scheduling,
    rate-based and detailed scheduling and now you want to set them only
    for detailed scheduling because of poor performance,
    note that all existing planned orders have to be scheduled again at a
    later time.

    ¿Cómo puede suceder esto?

    If you would like to have universal planning for production rate
    oriented production, you have the following options:
    You can use the <ZH>detailed</> scheduling level only. Set the
    <ZH>scheduling</> and/or <ZH>capacity planning</> indicators. Then you
    can also use rate routings in scheduling.
    You can use the detailed and rate-based scheduling levels. You can
    determine basic order dates and remove bottlenecks by means of capacity
    leveling at the rate-based scheduling level. At the detailed scheduling
    level, you should only carry out capacity leveling for the basic order
    dates determined by rate-based scheduling. This means you must set the
    parameters for detailed scheduling in Customizing in such a way that
    the basic order dates are not adjusted.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP C7111 - Verifique si planificación a varios niveles es conveniente, ver txt exp. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker