Message class: AP - Investment program messages
Message number: 257
Message text: Imposible modificar la asignación
You want to change the assignment of a measure (or of an appropriation
request) to a program position. However, the program position specifies
that the measure (or the measures assigned to the appropriation
request) receives its budget by means of budget distribution from this
program position, and a budget has already been distributed to the
measure (to the measures assigned to the appropriation request). It is
therefore no longer possible to change the assignment.
Changing the assignment is not allowed.
First return the budget from the measure (from the measures that are
subordinate to the appropriation request) to the program position.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
AP257
- Imposible modificar la asignación ?Get instant SAP help. Start your 7-day free trial now.
AP256
Porcentaje = 0 no permitido: Utilizar función borrado
¿Qué causa este problema? You wanted to set the assignment percentage rate to zero, which approximates the deletion of the assignment. However, to ...
AP255
Porcentaje = 0 no permitido
¿Qué causa este problema? You entered an assignment without an assignment percentage rate or with an assignment percentage rate of zero.Respuesta d...
AP258
Para orden &1 bloqueos plan en programa inversiones asignado
¿Qué causa este problema? You want to change plan values for order &V1&. An investment program position is directly or indirectly assigned ...
AP259
Falta autorización para orden &1 en programa inversiones asignado
¿Qué causa este problema? You want to change plan values for order &V1&. An investment program position is directly or indirectly assigned ...
Haga clic en este enlace para buscar todos los mensajes de SAP.