Do you have any question about this error?
Message type: E = Error
Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S
Message number: 019
Message text: Total anual de flujo caja por entrada en año &1 es muy grande
As the result of entering planned (negative) costs or revenue in year
&V1&, the cumulative value (added over all years) of the cash flow
exceeds the maximum number of pre-decimal places (&V2&) after the
tranlation from &V3& to &V4&.
The maximum allowed number of pre-decimal places in the planning table
is based on the currency-specific number of decimal places and the
scaling factor that you entered in the planning profile.
It is not possible to transfer the value.
Adjust the plan values so that the cumulative annual value does not
exceed &V2& pre-decimal places.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
AO_PLANNING019
- Total anual de flujo caja por entrada en año &1 es muy grande ?Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING018
Total anual gsts.grls./cuotas invers.p/entrada en año &1 es muy grande
¿Qué causa este problema? As the result of entering planned investment or overhead costs in year &V1&, the cumulative value (added over all...
AO_PLANNING017
Total ingresos supera mediante entrada en año &1 la magnitud máxima
¿Qué causa este problema? As the result of entering revenue in year &V1&, the cumulative revenue exceeds the maximum number of pre-decimal ...
AO_PLANNING020
Valor capital no se puede calcular en moneda de objeto &2
¿Qué causa este problema? The system determines the net present value in object currency &V2& internally by translating controlling area cu...
AO_PLANNING021
Transferencia valor plan imposible por moneda de objeto divergente