How To Fix AO529 - Desbordamiento interno campo: Borrar primero costes grles.y actualizar


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AO - Appropriation requests - Master data / Customizing

  • Message number: 529

  • Message text: Desbordamiento interno campo: Borrar primero costes grles.y actualizar

  • Show details Hide details
  • During the update of the change document, the system internally
    determines the difference between the newly entered plan value and the
    old plan value. In the current case, this difference exceeds the
    maximum allowed number of places before the decimal point (pre-decimal
    places), which is &V1&.

    Respuesta del sistema

    Transferring the value is not possible.

    ¿Cómo arreglar este error?

    If the old plan value was already updated, first delete the old plan
    value and save. Then call the transaction again. This time it is
    possible to transfer the new plan value.
    If no plan values have been updated yet for the given year, you do not
    have to save.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP AO529 - Desbordamiento interno campo: Borrar primero costes grles.y actualizar ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker