Do you have any question about this error?
Message type: E = Error
Message class: AJ - Billing program
Message number: 656
Message text: DPC-ESTB: Determinación resultados lectura p.período previo errónea
When determining meter reading results within dynamic period control,
and there are no estimated meter reading results on the database (the
category of the current period = 1000 or 2000) an error occured in
routine DPC_ADV_IZWST_VIA_SIM_GET (LEA01F02) for period &V1&- &V2& that
is to be created. The exact cause of error is written in the previous
message and occured in function module ISU_SIM_IZWST_ESTABLISH.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Check the meter reading results for the installation. Contact SAP if
you cannot correct the error yourself.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
AJ656
- DPC-ESTB: Determinación resultados lectura p.período previo errónea ?Get instant SAP help. Start your 7-day free trial now.
AJ655
Control dinámico de períodos &1 no puede combinarse con cuota fija
¿Qué causa este problema? You selected dynamic period control &V1&. You cannot combine this with the budget billing. El sistema emite un me...
AJ654
DPC-ESTB: Determinación resultado lectura para fin &2 errónea
¿Qué causa este problema? When determining meter reading results within dynamic period control, and there are no estimated meter reading results on...
AJ657
DPC-ESTB: Determinación resultados lectura p.período previo errónea
¿Qué causa este problema? When determining meter reading results within dynamic period control, and there are no estimated meter reading results on...
AJ658
Determinación de resultados de lectura para período previo errónea
¿Qué causa este problema? An error occurred in routine IZWST_EXTEND_FOR_VOR (LEA01F02) during the determination of meter reading results for the pr...
Haga clic en este enlace para buscar todos los mensajes de SAP.