How To Fix 62175 - La variante de liquidación debe tener una periodicidad anual


62175 - Overview

  • Message type: E = Error

  • Message class: 62 - Message Texts for Real Estate

  • Message number: 175

  • Message text: La variante de liquidación debe tener una periodicidad anual

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to save a settlement variant that is defined as a
    year-independent variant. The settlement periods for this variant must
    be repeatable with a period of one year and without overlaps.

    Respuesta del sistema

    The settlement variant is not saved.

    ¿Cómo arreglar este error?

    Please define the settlement periods in such a way that date of the
    first settlement plus one year is after the settlement period last
    defined. The interval between settlement periods does not have to be
    identical.
    If a settlement variant only comprises one settlement period, it is
    always periodic.

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    Example for the year 2016:
    a) Incorrect!!
    To-month To-day Year shift Concrete period for 2016
    01 31 0 03/01/16 to 31/01/16 Error
    02 28 -1 02/01/2016 to 02/28/2017
    b) Correct
    To-month To-day Year shift Concrete period for 2016
    07 31 0 02/01/2016 to 07/31/2016
    01 31 -1 08/01/2016 to 01/31/2017

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


62175 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author