Do you have any question about this error?
61
›
61339
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 339
Message text: Problema de cronomarcador: Modificación de orden previsional &1 cancelada
The changes to planned order &V1& were terminated. The cause of the
termination is the presence of differences with regard to the planned
order time stamp between the planned order (outbound status before the
change) and the database status of the corresponding planned order.
For every database change to a planned order, the system checks the
time stamp for the planned order and sets this again. This stores the
last time at which the planned order was changed.
The timestamp check is successful, when the timestamp of a planned
order read from the database by another application at the time when
the database change is made exactly matches the timestamp of the
planned order in the database.
In all other cases, the planned order has been changed by a parallel
application at some point in between times.
Whem timestamp problems occur, the system usually skips over the
planned order in question during updating. Updating is only terminated
when parallel changes are made to any dependent data in further update
update processes for the planned order, for example, status information
about capacity requirements records.
To avoid inconsistent planned orders, the changes have been terminated.
Start the transaction again in order to make your required changes at
the most current status.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
61339
- Problema de cronomarcador: Modificación de orden previsional &1 cancelada ?Get instant SAP help. Start your 7-day free trial now.
61338
Planificación individual en modo simulación imposible p.material &1 &2
¿Qué causa este problema? You want to plan material &V1& plant &V2& within multilevel single-item planning. This material is part o...
61337
Planific.orden cliente/proyecto p.material &1 &2 imposible
¿Qué causa este problema? You want to execute sales order planning or project planning for material &V1& plant &V2&. Requirements t...
61340
******* COMENTARIO: 340- comprobaciones de número de serie
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error especÃfico 'se explica por sà mismo', no se ha proporcionado más información. ...
61341
El número de serie & no está activo
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error especÃfico 'se explica por sà mismo', no se ha proporcionado más información. ...
Haga clic en este enlace para buscar todos los mensajes de SAP.