Do you have any question about this error?
Message type: E = Error
Message class: X4 - APO Core Interface: Interfaces for Manufacturing Orders
Message number: 204
Message text: The creation of operations is not supported
An order containing an operation that does not exist in the ECC order
was sent from SAP APO to SAP ECC. Integration cannot be used to create
operations.
The operation is not created. However processing of the order is
continued.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
X4204
- The creation of operations is not supported ?The SAP error message X4204, which states "The creation of operations is not supported," typically occurs in the context of production planning or when working with routing and operations in SAP. This error indicates that the system is unable to create operations for a particular routing or production order due to certain constraints or settings.
Causes:
- Routing Configuration: The routing may not be properly configured, or the operation types may not be allowed for the specific material or production process.
- Material Master Settings: The material master record may not have the necessary settings for operations to be created.
- Production Version: The production version may not be defined or may not be active for the material in question.
- Status of the Order: The production order or process order may be in a status that does not allow for the creation of new operations.
- Missing Authorizations: The user may lack the necessary authorizations to create operations in the system.
Solutions:
- Check Routing: Verify that the routing for the material is correctly defined and that the operation types are valid for the production process.
- Review Material Master: Ensure that the material master record is complete and that all necessary views (like MRP, Work Scheduling) are properly maintained.
- Validate Production Version: Check if the production version is defined and active for the material. If not, create or activate the appropriate production version.
- Order Status: Ensure that the production order is in a status that allows for the addition of operations. If necessary, change the status of the order.
- User Authorizations: Confirm that the user has the required authorizations to create operations. If not, contact your SAP security administrator to adjust the permissions.
Related Information:
CA01
(Create Routing), C202
(Change Routing), or CO01
(Create Production Order) to check or modify the relevant settings.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and routing.
Get instant SAP help. Start your 7-day free trial now.
X4203
Processing status of order &1: &2 &3 &4
This message is only for analysis purposes for SAP.Error message extract from SAP system. Copyright SAP SE. ...
X4202
Transfer terminated after error occurred during transfer of order &1
What causes this issue? When order &V1& was transferred from SAP APO to SAP ECC an error occurred that prevents further processing of this or...
X4205
The creation of components is not supported
What causes this issue? An order containing a component that does not exist in the ECC order was sent from SAP APO to SAP ECC. Integration cannot be ...
X4206
The creation of items is not supported
What causes this issue? An order containing an item that does not exist in the ECC order was sent from SAP APO to SAP ECC. Integration cannot be used...
Click on this link to search all SAP messages.