How To Fix WXPB801 - Planning level &1 has been assigned several meanings


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WXPB - MAP Messages: SAP R/3 Enterprise Add-On

  • Message number: 801

  • Message text: Planning level &1 has been assigned several meanings

  • Show details Hide details
  • What causes this issue?

    You have characterized the planning level &V1& as a special planning
    level (for example, "material group" or "assortment"). You have chosen
    several meanings for the characterization (for example, the meaning
    "material group" and the extra meaning "assortment"). Only one meaning
    is permitted for each planning level, however.

    System Response

    The planning scenario cannot be activated.

    How to fix this error?

    Select a maximum of one meaning for each planning level.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WXPB801 - Planning level &1 has been assigned several meanings ?

    Certainly! Here's a detailed explanation for the SAP error message WXPB801: Planning level &1 has been assigned several meanings:


    Error Message

    WXPB801: Planning level &1 has been assigned several meanings


    Cause

    This warning message occurs in SAP when a planning level in the Production Planning (PP) or Product Cost Planning (PCP) module is assigned multiple meanings or purposes simultaneously.

    In SAP, a planning level is used to define the granularity or level at which planning data is maintained or processed (e.g., plant, storage location, production line). Each planning level should have a unique and clear meaning to avoid ambiguity in planning processes.

    If the same planning level is assigned to different meanings (for example, both as a production line and as a storage location), the system raises this warning because it can lead to inconsistent or incorrect planning results.


    When does it occur?

    • During configuration of planning levels in transaction OPPQ (Maintain Planning Levels).
    • When assigning planning levels to different organizational units or planning objects.
    • During data validation or planning run if the system detects conflicting assignments.

    Solution

    1. Check Planning Level Configuration:

      • Go to transaction OPPQ (or the relevant IMG path: Production -> Production Planning -> Master Data -> Work Scheduling -> Define Planning Levels).
      • Review the planning level &1 mentioned in the message.
      • Verify the meanings assigned to this planning level.
    2. Correct the Assignments:

      • Ensure that each planning level is assigned only one meaning.
      • If multiple meanings are assigned, decide which meaning is correct or intended.
      • Remove or reassign the incorrect or conflicting meanings.
    3. Consistency Check:

      • After correction, perform a consistency check or test planning run to ensure the warning no longer appears.
      • Make sure that all related master data and planning objects align with the corrected planning level meaning.
    4. Transport Changes:

      • If changes are made in a development or test system, transport the corrected configuration to production.

    Related Information

    • Planning Levels are critical in SAP PP and PCP for defining the scope and detail of planning.
    • Incorrect planning level assignments can cause:
      • Incorrect planning results.
      • Data inconsistencies.
      • Errors or warnings during planning runs.
    • Refer to SAP Help or SAP Notes for detailed guidance on planning level configuration.
    • SAP transaction OPPQ is the main tool for maintaining planning levels.
    • This warning is informational but should be resolved to avoid downstream issues.

    Summary

    Aspect Description
    Cause Planning level assigned multiple conflicting meanings.
    Effect Ambiguity in planning processes, potential errors.
    Solution Review and correct planning level assignments in OPPQ.
    Transaction OPPQ (Maintain Planning Levels)

    If you need, I can also help you with step-by-step instructions on how to check and correct the planning level assignments.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant