How To Fix WXPA016 - Plan version &1 is not assigned to scenario &2 / step &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WXPA - MAP: External Applications

  • Message number: 016

  • Message text: Plan version &1 is not assigned to scenario &2 / step &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WXPA016 - Plan version &1 is not assigned to scenario &2 / step &3 ?

    The SAP error message:

    WXPA016 Plan version &1 is not assigned to scenario &2 / step &3

    typically occurs in the context of SAP Product Lifecycle Costing (PLC) or Product Cost Planning when working with planning versions, scenarios, and steps.


    Cause

    This error means that the plan version you are trying to use or reference is not assigned to the specified scenario and step in the system. In SAP, plan versions are linked to specific scenarios and steps to control and organize different planning data sets. If the plan version is not properly assigned, the system cannot find the relevant data for the scenario/step combination you are working with.


    Explanation of the placeholders:

    • &1 = Plan version (e.g., 0001)
    • &2 = Scenario (e.g., 01)
    • &3 = Step (e.g., 0001)

    When does this happen?

    • When you try to execute costing or planning functions that require a plan version linked to a scenario and step.
    • When you try to display or change data for a plan version that has not been assigned to the scenario/step.
    • During data transfer or simulation runs in PLC or Product Cost Planning.

    Solution

    1. Assign the Plan Version to the Scenario and Step:

      • Use transaction CKMSTART or CKM3 (depending on your SAP version and module) to check plan versions.
      • Go to the configuration or master data maintenance for plan versions.
      • Assign the plan version to the required scenario and step.
    2. Check the Configuration:

      • In customizing (SPRO), navigate to:
        Controlling -> Product Cost Controlling -> Product Cost Planning -> Version Management -> Define Plan Versions
      • Ensure that the plan version is assigned to the correct scenario and step.
    3. Use Transaction CKM3 or CKMSTART:

      • Verify if the plan version exists and is assigned.
      • If not, create or assign it accordingly.
    4. Check User Input:

      • Verify that the correct plan version, scenario, and step are entered in the transaction or report.
      • Sometimes a typo or wrong input causes the system to look for a non-assigned plan version.
    5. Transport or Copy Plan Versions:

      • If you are working in a development or test system, ensure that plan versions and their assignments have been transported correctly.

    Additional Information

    • Plan Versions are used to manage different sets of planning data, e.g., current plan, target plan, simulation plan.
    • Scenarios and Steps allow you to organize and differentiate planning data within a plan version.
    • Proper assignment is crucial for costing runs, simulations, and reporting.
    • This error is common when setting up new plan versions or when migrating data between systems.

    Summary

    Aspect Details
    Cause Plan version not assigned to scenario/step.
    Solution Assign plan version to scenario and step via customizing or master data maintenance.
    Transactions CKMSTART, CKM3, SPRO (for customizing)
    Context Product Cost Planning, Product Lifecycle Costing

    If you need specific steps on how to assign plan versions to scenarios and steps in your SAP system, please let me know your SAP module and version, and I can provide detailed instructions.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant